• Technical meetings on evaluating the materials of the anti-shock coating on the skeleton with different companies
• Contracts with contractor Aran Sage, contractor for metal skeleton phase 2
• Contract with Pasargad Company, contractor for installing metal skeleton and ceiling for phase two of the contract
• Contracts with Iran Pich Corporation to supply the bolts and nuts needed for the installation of the metal frame of the Phase 2
• Contract with Geotechnical Consultant, Consultant, Laboratory Resident Employer
• Contract with Tekin Koo Co, steel skeleton welding inspection Consultant
• Contracts with cutting company, instrumental monitoring consultant based on the project
• Open the entrance to the south ramp to the negative floors and parking lots