-ground floor :
- Mineral performance
Category +1:
- Execution of fan coil
- Implementation of medical gas system valve box
-2 + category:
- Execution of mosaic
- Execution of fan coil
- Mineral performance
Floor +3:
- Execution of medical gas system pipe
- Execution of rock wool
- Mineral performance
- Execution of Knauf wall
- Implementation of medical gas system valve box
-4 level:
- Implementation of medical gas system valve box
- Execution of medical gas system control box
- Execution of support, pipes and cans of switches and sockets
- Execution of elastomeric insulation of water supply system (galvanized pipe)
- Execution of rock wool
- Installation of manual dampers and return duct fire
- Execution of steel piping
- Execution of Knauf wall
- Mineral performance
- Execution of wiring (electrical outlet system)
- Execution of wiring (lighting system)
- Execution of fan coil
-File +8 and above:
- Execution of white cement in the eastern electrical room 9+, 10+, 11+, +12, 22+, 23+, +24
- Execution of vertical wall post on the surrounding wall +17
- Execution of wall color of Gharb electricity room +10, ++, 12+, 13+, 14+
- Execution of masonry +21, +25
- Mineral performance 9+, 10+, 11+, 12+, 13+, 14+, 15+, +16, +17
- Installing wall post plate floor +13, +23
- Execution of perimeter knauf wall substructure +10, +11, +12, +13
- Execution of staircase +19, +20, +21, +22
- Implementation of facilities related to parking lots, clinics and hospitals is underway and the overall progress has reached about 21%.
- The implementation of mechanical facilities related to parking lots, clinics and hospitals has reached 24% overall progress.
- The implementation of electrical installations related to parking lots, clinics and hospitals has reached an overall progress of 19%.